Completed commercial building by Iron Construction Group
Our Portfolio

Projects that speak for us

Commerce Park commercial building exterior
Commercial Construction

Commerce Park Phase II

Phoenix, AZ

320,000 sq ft of Class-A office and flex space delivered 14 months from groundbreaking.

High Desert Solar Farm ground-mount array
Solar Energy

High Desert Solar Farm

Las Vegas, NV

12 MW utility-scale array with 6 MWh of battery storage and full monitoring.

Summit Ridge custom home exterior
Residential Construction

Summit Ridge Residences

Boulder, CO

42 custom mountain homes built to a net-zero-ready standard.

Meridian Corporate Campus interior
Commercial Construction

Meridian Corporate Campus

Denver, CO

Two weeks early on a 320,000 sq ft Class-A office campus for Meridian Properties.

Harbor Point solar array at sunset
Solar Energy

Harbor Point Solar Array

San Diego, CA

4.5 MW commercial rooftop system producing at 112% of projected output.

Ironline Manufacturing facility steel erection
Industrial Construction

Ironline Manufacturing Facility

Toledo, OH

Full plant rebuild delivered without a single day of lost production.

Lakeside custom home with solar-ready roof
Residential Construction

Lakeside Custom Homes

Austin, TX

Eight solar-ready custom homes with pre-wired storage and smart panels.

GridEdge battery-backed home solar system
Solar Energy

GridEdge Battery Project

Mesa, AZ

Whole-home backup systems keeping 200+ homes online through grid outages.

Northgate Retail Center glass facade
Commercial Construction

Northgate Retail Center

Nashville, TN

85,000 sq ft retail and mixed-use center completed in 11 months.

Showing all projects.

Construction site with cranes at dusk
Your Project Next

Want results like these?

Tell us what you're building and let's put your project on this page.